Back to all reports

以太坊研究日报

Ethereum Research Daily

EIP-8141 Frame Transaction, submitted by fjl and coauthors, merged the same day: a new transaction type whose validity and gas payment are defined abstractly, letting accounts use any cryptographic system for signatures, and it was proposed as a Hegotá headliner. chunter-cb submitted an ERC-20 gas payment extension for EIP-8130. ACDE #229 collected Hegotá headliner candidates ahead of the February 4 deadline. aelowsson analyzed two equilibrium failure modes in EIP-8037.

Image for January 29, 2026

Image: Ethereum Magicians, EIP-8141: Frame Transaction

Native AA: EIP-8141 Frame Transaction

Add EIP: Frame Transaction

(fjl), submitted and merged; EIP-8141: add the missing elision of VERIFY frame data (fjl), submitted and merged; Magicians thread EIP-8141 (matt), 10:35: a new transaction whose validity and gas payment are defined abstractly, so accounts no longer rely on one ECDSA signature and can define and interpret any cryptographic signature scheme.

https://github.com/ethereum/EIPs/pull/11202

Magicians thread EIP-8141

Add EIP: Frame Transaction (fjl), submitted and merged; EIP-8141: add the missing elision of VERIFY frame data (fjl), submitted and merged; Magicians thread EIP-8141 (matt), 10:35: a new transaction whose validity and gas payment are defined abstractly, so accounts no longer rely on one ECDSA signature and can define and interpret any cryptographic signature scheme.

https://ethereum-magicians.org/t/eip-8141-frame-transaction/27617

Native AA: EIP-8130 gas payments

Gas: EIP-8037 failure modes

Calls: ACDE #229

ACDE #229

21:00, per Ethereal news #9: EIP-7928 BAL parallel execution, batch reads and parallel state root are mandatory optimizations; EIP-7610 is CFI, while EIP-7872 and EIP-7949 were declined but clients should standardize; Hegotá headliner candidates are EIP-8141 frame transactions, the EIP-8105 encrypted pool, EIP-7807 SSZ execution blocks and consensus layer EIP-7805 FOCIL, with a February 4 deadline.

https://forkcast.org/calls/acde/229

Ethereal news #9

ACDE #229, 21:00, per Ethereal news #9: EIP-7928 BAL parallel execution, batch reads and parallel state root are mandatory optimizations; EIP-7610 is CFI, while EIP-7872 and EIP-7949 were declined but clients should standardize; Hegotá headliner candidates are EIP-8141 frame transactions, the EIP-8105 encrypted pool, EIP-7807 SSZ execution blocks and consensus layer EIP-7805 FOCIL, with a February 4 deadline.

https://ethereal.news/ethereal-news-weekly-9/

Other updates

Community