
Vitalik wrote a note on the recursive STARK mempool (EIP-8288), which he hopes gets into I*, the fork after Hegotá, as the next step after frame transactions; his EIP for a frame type for PQ signature and STARK aggregation was merged as a draft the same day. misilva73 simulated the first day of the gas limit rising from 60M to 200M: fees spike and then fall, and 9 of 12 demand scenarios end with median utilization near the target.




