Page 41 of 53 · January 29, 2026 to February 4, 2026

Image for February 4, 2026
  • Aggregation functions for EIP-8037 multidimensional metering
  • a Block Access List sidecars EIP
  • ERC-8004 live on Base
  • the L2 roadmap debate
  • EIP-8141 dependency update

misilva73 analyzed aggregation functions for EIP-8037 multidimensional metering under different demand elasticities, since aggregation decides how state gas and burst gas jointly set the base fee. nerolation submitted a BAL sidecars EIP so block access lists travel separately from the execution payload. Vitalik's L2 post from the night before drew debate, and jessepollak announced ERC-8004 live on Base.

Image for February 2, 2026
  • 69
  • 420 ETH staked straight from a Tornado Cash address
  • synchronous rollup composability via realtime proving
  • early rejection of adversarial BALs
  • ACDT #68 targets epbs-devnet-0 for late February

pcaversaccio deposited 69,420 ETH into the beacon deposit contract straight from his Tornado Cash address, showing a legitimate use of privacy tools. jbaylina wrote on synchronous rollup composability via realtime proving. Nero_eth proposed early rejection of adversarial BALs. ACDT #68 kept epbs-devnet-0 targeted for late February.

Image for January 30, 2026
  • The EF enters mild austerity
  • a Tornado funded Safe signer secures $220M
  • application controlled execution and cancel prioritization
  • data on keeping only one year of active state
  • the Block-in-Blobs EIP

VitalikButerin said the EF is entering a period of mild austerity for the next five years to deliver an aggressive roadmap while staying sustainable. pcaversaccio said his Safe signer is fully funded through Tornado Cash and secures over $220M. mikeneuder and maryam analyzed application controlled execution and Hyperliquid's cancel prioritization. weiihann measured the effect of keeping only one year of active state.

Image for January 29, 2026
  • EIP-8141 Frame Transaction submitted and merged
  • frame transactions proposed as a Hegotá headliner
  • ERC-20 gas payments for EIP-8130
  • ACDE #229 collects headliner candidates
  • failure modes in EIP-8037

EIP-8141 Frame Transaction, submitted by fjl and coauthors, merged the same day: a new transaction type whose validity and gas payment are defined abstractly, letting accounts use any cryptographic system for signatures, and it was proposed as a Hegotá headliner. chunter-cb submitted an ERC-20 gas payment extension for EIP-8130. ACDE #229 collected Hegotá headliner candidates ahead of the February 4 deadline. aelowsson analyzed two equilibrium failure modes in EIP-8037.